Choose Disaster Recovery Architecture by RTO and RPO

A disaster recovery design must meet both the recovery-time limit and the data-loss limit. Below: compare a synchronous active-active design with alternatives that change only replication or recovery time.

The ruleRTO limits time to restore service; RPO limits acceptable data loss. Accept a disaster recovery design only if it meets both limits for the required outage scope.

Try one first

A payment processor must meet an SLA that allows no data loss (RPO = 0) and limits outages to 15 minutes per incident (RTO ≤ 15 minutes). Production runs in DC1 and a second datacenter, DC2, is available and connected to DC1 by a low-latency, high-speed fiber link. Current backups are nightly tapes to off-site storage. Which of the following actions is required to meet the SLA?
Hint

Focus on which option both prevents any committed transaction from being lost at the secondary site and supports immediate, automated takeover without manual rebuild or extended restores.

Side by side

Base: synchronous active-activeSame facts, except asynchronous replicationSame facts, except 12-hour recovery
Required outage protectionQuickShip: complete data center lossQuickShip: complete data center lossQuickShip: complete data center loss
Business recovery limitsRTO: 5 minutes; RPO: 1 minuteRTO: 5 minutes; RPO: 1 minuteRTO: 5 minutes; RPO: 1 minute
Site readiness and traffic handlingGeographically separate active sites; automatic traffic redirectionGeographically separate active sites; automatic traffic redirectionGeographically separate active sites; automatic traffic redirection
Transaction replicationSynchronousAsynchronous; maximum lag of 2 minutesSynchronous
Tested full-service recovery30 seconds30 seconds12 hours
Maximum committed-transaction lossZero2 minutesZero
Meets five-minute RTO?Yes: 30 secondsYes: 30 secondsNo: 12 hours
Meets one-minute RPO?Yes: zero lossNo: 2 minutes of potential lossYes: zero loss
DecisionAccept: meets both limitsReject: fails RPO onlyReject: fails RTO only

Key points

  • Remember: fast recovery cannot offset excessive data loss, and zero data loss cannot offset slow recovery.
  • Synchronous replication protects committed transactions by persisting them at both sites before acknowledging completion.
  • Measure recovery through full-service restoration, not just automatic traffic redirection.

How the exam traps you

  • Choose the asynchronous variation because its 30-second recovery meets RTO. Its two-minute data-loss window exceeds the one-minute RPO.
  • Choose the slow-recovery synchronous variation because it loses no committed transactions. Its 12-hour recovery exceeds the five-minute RTO.

8 more, each from a different angle

0 of 8 answered · 0 correct

Question 2

A retailer's online ordering system is mission critical. Management states that after a primary data center outage, the system must be restored and available for use within 30 minutes. Assume cost is not the deciding factor. Which recovery approach is the most appropriate treatment for this availability requirement?
Hint

Focus on the required recovery time after the outage, not just whether data is preserved.

Question 3

An organization is choosing among three availability architectures for its applications: (1) synchronous active-active replication across two data centers, (2) asynchronous replication to a warm standby with automated failover, or (3) nightly backups with manual restore. Which of the following should most appropriately govern the selection among these options? Assume business recovery targets (acceptable downtime and acceptable data-loss, i.e., RTO and RPO) have been set by a business impact analysis/SLA; treat cost, hardware reliability, and performance as adjustable factors.
Hint

Distinguish the business-determined recovery targets (outcomes) from technical measurements or budgetary limits when deciding which factor should govern the choice.

Question 4

Company X runs a customer-facing e-commerce platform currently hosted in a single data center. Management has set these objectives: 99.95% availability per 30-day month (maximum allowable unplanned downtime = 21.6 minutes per month), maximum RTO per unplanned outage = 30 minutes, and maximum RPO = 5 minutes. For availability calculation assume no more than one unplanned outage will occur in the month. IT proposes the four architectures below. Which proposal is best supported by the facts to meet the availability and recovery objectives?
Hint

Calculate the maximum allowable monthly downtime (99.95% of a 30-day month = 21.6 minutes) and compare each architecture's expected unplanned downtime and replication lag against the RTO (30 min) and RPO (5 min) targets.

Question 5

An entity's revenue platform operates continuously. Management has approved these service objectives: (1) if a single server or operating-system failure occurs, user interruption must not exceed 2 minutes; (2) for that type of failure, no committed transaction may be lost; and (3) if the entire site is unavailable, recovery within 8 hours is acceptable. The current environment has one production database server with RAID, dual power supplies, and UPS protection; nightly full backups; 15-minute transaction-log backups replicated offsite; and documented, tested restore procedures. There is no redundant production node. Assume the application can reconnect automatically after failover and that local storage/networking can support synchronous writes between local nodes. Which additional control is the most appropriate response to the stated availability objectives?
Hint

Separate controls that improve recovery after failure from controls that keep processing available through the failure.

Question 6

A mid-sized online retailer currently hosts its e-commerce platform in a single primary data center. The company uses daily offsite tape backups and maintains a cold-site contract that can restore operations within 48 hours. A recent data-center flood caused a 6-hour outage. Management now requires an RTO of ≤ 1 hour and an RPO of ≤ 5 minutes for the e-commerce platform. Public cloud failover is not permitted because of customer data residency rules. The company has a moderate budget that can fund a paid disaster recovery solution for critical systems (such as the e-commerce platform) but cannot support continuous duplicate production capacity for all systems. Which of the following is the best action to meet management's RTO and RPO requirements for the e-commerce platform?
Hint

Decide which choice gives both a ready offsite system for rapid failover (short RTO) and a replication SLA that limits data loss to under five minutes (short RPO).

Question 7

A payment processor's published availability commitment for its authorization platform is to restore service within 15 minutes of a region-wide infrastructure failure and to lose no more than 1 minute of committed transaction data. The current design has the production application and database running only in Region A. Nightly immutable backups are stored in Region B, transaction data is replicated asynchronously to Region B every 5 minutes, infrastructure-as-code can build the application stack in Region B in about 12 minutes, and cutover requires manual activation plus DNS changes that take another 8 to 12 minutes. Assume the application is otherwise suitable for multi-region deployment. Which response is required to bring the design into line with the stated availability commitment?
Hint

Evaluate both thresholds separately first, then ask which option is the only one that fixes both without depending on rebuild time.

Question 8

A mid‑size firm operates a critical transaction processing application from an on‑premises primary data center. The firm's recovery objectives are an RTO of 4 hours and an RPO of 1 hour. Facts: the primary data center has UPS and a backup generator (monthly generator tests sometimes fail); application servers are clustered only within the primary site (no cross‑site clustering); storage is a single SAN at the primary site. The firm maintains a geographically separate warm site with sufficient compute capacity but receives data only via nightly backups (completed by 02:00 each day), and failover to the warm site requires manual activation and configuration estimated to take about 24 hours. Network connectivity between the primary and warm site uses a single ISP. Backups are verified after each nightly run. Considering the firm's recovery objectives, what is the primary system availability issue management should address?
Hint

Compare backup frequency and estimated failover time to the firm's RTO/RPO; the primary issue is the factor that most directly prevents meeting those timing targets.

Question 9

A payment-processing company operates its core transaction application across two owned data centers (Site A and Site B). Business requirements state that processing must continue if one entire data center fails, allowable data loss is zero (RPO = 0), and failover must complete within 30 seconds (RTO ≤ 30 s). Network latency between sites averages 20 ms. Management must choose an architecture to meet these availability SLAs. Which architecture is the most appropriate?
Hint

Match both parts of the SLA: whether the design prevents any data loss (RPO) and whether failover is fast enough (RTO); consider synchronous vs asynchronous replication and whether failover is automated and spans sites.

Drill all 168 System availability questionsMixed across every rule in the topic, so you have to spot which one applies. That is how the exam does it.

Common questions

What is the difference between RTO and RPO in disaster recovery?

RTO limits how long service can remain unavailable. RPO limits how much recent data can be lost. QuickShip requires recovery within five minutes and data loss of no more than one minute.

Does asynchronous replication meet a one-minute RPO?

The variation shown does not. Its maximum replication lag is two minutes, so potential data loss exceeds QuickShip's one-minute limit even though recovery takes only 30 seconds.

Does synchronous replication guarantee that a design meets RTO?

No. Synchronous replication addresses committed-transaction loss, not full-service recovery time. The slow-recovery variation loses no committed transactions but fails the five-minute RTO.

Watch it solved

A full CPA ISC task-based simulation on System availability, worked step by step.

System Availability & RTO/RPO | CPA ISC Simulation (TBS) on YouTube

Practice ISC like the real exam

The free ChatCPA simulator: real exam layout, timed testlets, starting with a question on this topic. No account needed to start.

Open the free simulator →

More on System availability

All System availability practice →

Questions from the ChatCPA bank of 17,658 CPA exam questions, each with a written reason for every wrong answer. ChatCPA is built by Nicholas Miller, CPA (Oregon #14907). How these pages are made. Spot an error? Tell us.